The 25MW PV Solar Photovoltaic Project in Romania is a significant renewable energy development aimed at harnessing solar power to generate clean electricity. Located in Romania, this project involves the installation of photovoltaic panels to produce approximately 25 megawatts of renewable energy, contributing to the country's sustainable energy goals. The project not only helps reduce carbon emissions but also promotes energy independence and supports Romania's transition towards greener, more sustainable power sources.
SPV 1 (90,000 EUR / MW + Land + Grid Connection)
Location
Romania, Constanta County
Capacity
Up to 4,4 MW DC + 1MW/ 2MWh storage & up to 8 MWh BESS standalone
Equipment
Invertors: VENCON HYBRID Inverter 300/4
PV panels: fixed structure, Trina Solar, TSM-450-NEG9R-28, 450 Wp (E/W)
Capacity factor
~1.160 kWh/kWp/year
Yearly production
5.150 MWh/year
Land rights
Superficies, 5,3 ha
Grid connection
ATR issued September 2024
up to 2,2 MW AC to be connected into 20/110 kV line
Development Status
Land rights secured
Topographical assessment finalized
Urban Planning Certificate permitting ongoing
SPV 2 (90,000 EUR / MW + Land + Grid Connection)
Asset
Independenta PV park project in development stage
Location
Romania, Constanta County
Capacity
Up to 8,75 MW DC + 1MW/2 MWh storage & up to 10 MWh BESS standalone
Equipment
Invertors: Huawei SUN--------KTL-INM0-415Vac
PV panels: fixed structure, Trina Solar, TSM-450-NEG9R-28, 450 Wp
Capacity factor
~1.340 kWp/year (with provisional equipment choice and set-up)
Yearly production
8.780 MWh/year
Land rights
Superficies, option up to 10 ha
Grid connection
CTES approval, ATR expected Q1/Q2 2025
up to 4,35 MW AC to be connected into 20/110 kV substation
Development Status
Land rights secured
Topographical assessment finalized
Urban Planning Certificate permitting ongoing
SPV 3 (90,000 EUR / MW + Land + Grid Connection)
Asset
Tufani PV park project in development stage
Location
Romania, Constanta County
Capacity
Up to 6 MW DC + BESS
Land rights
Superficies, 10 ha
Grid connection
Grid solution study ongoing
Development Status
Land rights secured
Topographical assessment finalized
Urban Planning Certificate permitting ongoing
SPV 4 (90,000 EUR / MW + Land + Grid Connection)
Asset
Deleni PV park project in development stage
Location
Romania, Constanta County,
Capacity
Up to 6 MW DC + BESS
Land rights
Superficies, 9,28 ha
Grid connection
Grid solution study ongoing
Development Status
Land rights secured
Topographical assessment finalized
Urban Planning Certificate permitting ongoing
Currency: EUR
Target Price / Revenue: TBD
Target Price / EBITDA: TBD
