The Kosovo 100 MW Solar PV Project is a strategically located renewable energy development designed to support Kosovo’s growing electricity demand and accelerate its long-term energy transition.
With all key permits secured and grid connection approved, the project is currently in its final pre-construction phase, fully positioned for immediate investment and construction readiness.
Key Project Highlights
Installed Capacity: 100 MWp
Expected Annual Generation: 177,500 MWh
Yield Factor: 1,775 kWh per kWp installed
Grid Connection: Approved and secured 110 kV transmission line
Land & Permits: Fully secured (environmental, land-use, construction permits)
Project Status: Advanced development stage – ready for construction
Financial Overview
Total Project CAPEX: €90 million
Annual OPEX: €1.46 million
Revenue Potential: At €62/MWh tariff, projected annual revenue of ~€12.8 million
Average Annual Net Cash Flow: ~€11.4 million
Equity IRR: 15%
Equity Payback Period: 5.5 years
NPV (12% discount rate): €7.2 million
Levelized Cost of Energy (LCOE): €30/MWh
Financing: Senior debt financing has been successfully secured and ratified via banking institutions.
Market & Investment Potential
Kosovo is actively pursuing a strategic diversification of its energy mix, with a strong focus on reducing reliance on coal and expanding renewable energy capacity.
The project is fully aligned with national energy transition objectives and EU integration goals, particularly in emissions reduction and clean energy expansion.
With a fully secured permitting package and approved grid connection, the project offers a significantly de-risked development profile and a clear execution pathway.
Once operational, the plant will deliver long-term, low-cost renewable energy to the national grid, supporting both energy security and sustainability targets.
Capital Structure: Senior debt financing has been successfully secured and ratified via banking institutions.
Note: The Seller is actively seeking a strategic equity partner for 20–30% participation in the project.
Disclaimer
All financial figures, projections, and performance metrics presented in this document are indicative and based on current assumptions. Actual results may vary due to factors including, but not limited to, inflation, foreign exchange fluctuations, regulatory changes, and market conditions such as currency depreciation or energy price volatility.
Currency: USD
Target Price / Revenue: TBD
Target Price / EBITDA: TBD
