
Since its establishment our company has concentrated its efforts and knoweledge in the development and accomplishment of Water Electric Plants Projects. Through the precise and competent work of our specialists we have managed to design and develop Projects, acomplishing modern technological decisions, to acuire land, best serving our Project's needs; to secure the applicable permits from the competent authorities. The company is sold with two Projects of Water Electrical Plants in a very advances stage of development with already acomplished 70% of the invesment costs.
The Company has adopted the Quality Management System ISO 9001:2008 and has been certified under DIN 18800-7 and EN3834-3 as well.
Paramters of the Water Electrical Plant - 1
Capacity: Installed capacity 220 kW (possilbe 650 kW)
Geografical position: Northwest Bulgaria
Ownership of land: Land is owned by the company
Turbines planned to install: Two turbines type "Cross Flow"
Connection to power transmission grid: Preliminary Contract from 2009, voltage at connection 20 kV
Planned annual output: 0,875 mill kWh
Electricity selling rate: $ 0,07 / kWh
Investments required: $ 490 000
Turbines lifecycle: 20 000 hours
Planned annual profitability: $ 86 252,10
Building permit: Dated 18.03.2010
Permit for water usage: Dated 02.10.2009
Present condition of the Project: Design completed, all permits acquired
Paramters of the Water Electrical Plant - 2
Capacity: Installed capacity 190 kW
Geografical position: Northwest Bulgaria
Ownership of land: Land is owned by the company
Turbines planned to install: Three turbines type "Fransis"
Connection to power transmission grid: Preliminary Contract from 2009, voltage at connection 20 kV
Planned annual output: 0,93 mill kWh
Electricity selling rate: $ 0,07 / kWh
Investments required: $ 210 000
Turbines lifecycle: 20 000 hours
Planned annual profitability: $ 69 711,40
Building permit: Renewed February 2010
Permit for water usage: Renewed 06.04.2009
Present condition of the Project: Design completed, all permits acquired; Water intake - 80% completed;
Pipeline - 90% completed; Mechanical equimpment - 75 % delivered;
Building - 40% completed; Electrical and I&C part - 25% completed
Limited Free Trial Available.
If you own a business and are considering selling, visit our Sell an Electrical Services Business section.



Advertisement